Construction Documents

What Is a Submittal in Construction?

A submittal is a document, sample, or product data that a contractor sends to the architect or engineer for review and approval before the material or equipment is fabricated, purchased, or installed. Submittals verify that the proposed products meet the design intent and specification requirements.

How HomeFloorPlan helps

With HomeFloorPlan, you can attach submittal documents directly to the relevant drawing sheet and tag them by trade. Review happens in the comment thread on the sheet, where reviewers pin their notes to the detail in question and the thread is marked resolved once it is settled. There is no separate approve or reject state, so a formal submittal register still belongs in whatever system you use for contracts.

Submittals are a core part of the construction quality control process. They can include shop drawings, product data sheets, material samples, color selections, certificates, test reports, and manufacturer literature. The contractor prepares and forwards submittals to the design team, who reviews them and returns them with a status such as approved, approved as noted, revise and resubmit, or rejected.

The submittal process begins during the pre-construction phase and continues throughout the project. A submittal schedule is typically created early in the project to coordinate which items need to be submitted, when they are due, and how long the review cycle will take. This schedule is critical for procurement because many materials have long lead times.

Each submittal is logged with a unique number, a description, the specification section it relates to, and its current status. On large commercial projects, the submittal log can contain hundreds of entries spanning every trade on the job.

Why it matters

Submittals protect the owner by ensuring that installed materials match the design intent. They also protect the contractor by securing written approval before purchasing expensive materials. A missed or delayed submittal can push back fabrication and delivery schedules, creating downstream delays that affect the entire project timeline.

Comparing tools for this workflow? See our ranked guide to the best construction drawing management software.

Frequentlyasked questions

Your next set, in one place.Your whole crew, on it today.

Sign up, upload a drawing set, and share it with your crew. The first 30 days are free and we do not ask for a card.