Document the job site with reports tied to the plan.

File field reports from a template your office builds once: the fields you already collect, crew and equipment rows with hours, weather, and the plan pins from that day. Each report carries a number, a date, and a record of who submitted and approved it.

The problem

Field reports are one of the most important records on a construction project, and one of the most neglected. The super walks the site, takes notes on a legal pad, snaps photos on their phone, and by the time they sit down to type it up at the end of the day, the details are fuzzy. Which floor was that concrete pour on? Which unit had the water intrusion? The notes say "east wall" but there are four east walls on this project.

When a dispute or claim comes up six months later, the team scrambles to find field reports that prove what happened and when. The photos are buried in a camera roll with no connection to the drawings. The written reports reference locations that nobody can pin down. The project team ends up spending hours reconstructing a timeline from fragments when the record could have been made on site while the work was in front of them.

How HomeFloorPlan solves it

Your office builds each report type once as a template, and the field fills it in on a phone. Add the fields your reports actually need (text, numbers, dropdowns, checkboxes, dates, times, photos, a signature), group them into your own sections, and mark the ones that cannot be left blank. On site the super records the weather, logs each crew with its company and hours, lists the equipment that ran, and adds a row for every delivery, visitor, inspection, phone call, delay, accident, safety item, and load of waste.

Photos attach straight to the report, so the condition you are describing is in the same place as the words describing it. Each report carries a sequential number and the calendar day it covers, moves from draft to submitted to approved with the person and the time recorded at each step, and leaves as a PDF, a CSV, or an email.

Key features

Templates your office controls

Set up each report type once with the fields you need: text, numbers, dropdowns, checkboxes, dates, times, photos, and a signature, grouped into your own sections and marked required where it matters.

Crew, equipment, and delays as rows

Log who was on site and for how many hours and what equipment ran. Deliveries, visitors, inspections, phone calls, delays, accidents, safety items, and waste each get their own rows with a company and a contact.

The day's plan pins, attached

Photos attach to the report itself, so the day's conditions sit with the day's record rather than in a camera roll.

Submit, approve, and send

Every report has a sequential number and the calendar day it covers. It moves from draft to submitted to approved with the person and time on each step, then exports as a PDF or a CSV or goes out by email.

Why teams choose HomeFloorPlan

  • Fill the report in on site instead of reconstructing the day in the trailer
  • Keep one report format across every job by reusing a template your office controls
  • Record manpower, equipment, and delays in fields that can be read back, not in free text
  • Tie each report to the plan pins it describes and to the people who submitted and approved it
  • Hand an owner or an attorney a numbered, dated PDF rather than a folder of photos